Operations and maintenance
-
Omen brings chemistry into uptime
Omen AI has raised $31m to expand real-time fluid monitoring for AI data centres.
-
QuiX wants quantum out of the lab
QuiX Quantum’s Dedalo architecture is designed to bring photonic quantum systems closer to data centre environments.
-
OVHcloud and Scality harden the sovereign stack
The companies are pairing on-prem cloud infrastructure with cyber-resilient object storage for AI workloads.
-
Schneider buys deeper into the plant
Schneider Electric’s $3.1bn Cognite deal pushes industrial AI closer to critical infrastructure operations.
-
Durata takes the powertrain off site
Durata has launched PowerCore, a factory-built electrical powertrain for data centres and critical infrastructure.
-
Envision rewires the AI power pitch
Envision has launched integrated energy systems aimed at the power constraints behind AI data centres.
-
Compute moves under the Dolomites
Trentino DataMine has opened an underground data centre inside an active Dolomites mine.
-
Dublin builds around the grid
Ingeteam has supplied a 10MW battery system for Pure DC’s Dublin data centre microgrid.
-
LuxConnect puts solar on the roof
LuxConnect has added 300kWp of rooftop solar to DC1.3 at its Bettembourg campus.
-
Boden becomes HIVE’s liquid-cooled bet
HIVE’s Swedish lease plan would push Boden into high-density GPU colocation with direct-to-chip cooling.








