News
-
Oil risk reaches the data centre tender
Currie & Brown warns UK data centre construction costs could rise if oil prices stay elevated.
-
Compute moves under the Dolomites
Trentino DataMine has opened an underground data centre inside an active Dolomites mine.
-
Dublin builds around the grid
Ingeteam has supplied a 10MW battery system for Pure DC’s Dublin data centre microgrid.
-
Le Bourget turns on SEGRO
A proposed 75MW SEGRO data centre near Paris is facing renewed local opposition.
-
Granada gets a 70MW AI test
Alto Infrastructure has started work on a 70MW AI and HPC campus in Granada.
-
South Wales gets another data centre test
Maska Group’s Rhondda Cynon Taf proposal brings data centre planning back to power, cooling, and disclosure.
-
Amazon buys into Scottish wind
Amazon’s 90MW Chirmorie PPA ties UK digital infrastructure load to new onshore wind procurement.
-
Larbert pushes back on 300MW AI campus
Apatura’s proposed 300MW Larbert campus is testing Scotland’s appetite for large AI infrastructure.
-
Prologis sees power inside SEGRO
Prologis’s rejected £12.6bn SEGRO approach puts power-rich land and data centre pipelines into takeover territory.
-
LuxConnect puts solar on the roof
LuxConnect has added 300kWp of rooftop solar to DC1.3 at its Bettembourg campus.









