Sustainability
-
Equinix turns Milan heat into supply
Equinix and A2A plan to export up to 225GWh a year of data centre heat into Milan’s district heating network.
-
Google’s AI load strains the green story
Google’s latest environmental reporting shows electricity, water, and construction emissions rising with AI demand.
-
Mayors write terms for the AI factory
The Global Urban Data Centres Pact gives cities a shared framework for managing data centre growth.
-
Europe’s green pact faces the meter
EUDCA has renewed its climate-neutral 2030 pledge as EU data centre reporting tightens.
-
Edinburgh’s supercomputer gets concrete
Construction has started on buildings for the UK’s new £750m national supercomputer near Edinburgh.
-
Virtus packs more load into Slough
Virtus is developing LONDON19, a 32.5MW data centre at Slough Trading Estate.
-
Slough’s power draw enters the record
New UK statistics put Great Britain’s 2024 data centre electricity consumption at 4.5TWh.
-
Devon weighs a 1.5GW AI load
Xlinks is consulting on a 1.5GW Devon AI data centre and battery storage campus.
-
Envision rewires the AI power pitch
Envision has launched integrated energy systems aimed at the power constraints behind AI data centres.
-
Compute moves under the Dolomites
Trentino DataMine has opened an underground data centre inside an active Dolomites mine.








