Power and energy
-
Virtus packs more load into Slough
Virtus is developing LONDON19, a 32.5MW data centre at Slough Trading Estate.
-
Slough’s power draw enters the record
New UK statistics put Great Britain’s 2024 data centre electricity consumption at 4.5TWh.
-
Norfolk site follows the power line
Norwich Apex is preparing plans for a roughly 150MW data centre on a former business park site.
-
Devon weighs a 1.5GW AI load
Xlinks is consulting on a 1.5GW Devon AI data centre and battery storage campus.
-
Envision rewires the AI power pitch
Envision has launched integrated energy systems aimed at the power constraints behind AI data centres.
-
Kyivstar puts AI compute onshore
Kyivstar and Ukraine’s economy ministry will explore sovereign AI-ready data centre capacity inside Ukraine.
-
Oil risk reaches the data centre tender
Currie & Brown warns UK data centre construction costs could rise if oil prices stay elevated.
-
Dublin builds around the grid
Ingeteam has supplied a 10MW battery system for Pure DC’s Dublin data centre microgrid.
-
Granada gets a 70MW AI test
Alto Infrastructure has started work on a 70MW AI and HPC campus in Granada.
-
South Wales gets another data centre test
Maska Group’s Rhondda Cynon Taf proposal brings data centre planning back to power, cooling, and disclosure.







