News
-
Google opens a side door to liquid cooling
Google’s Brazos system brings liquid cooling into air-cooled rooms incrementally.
-
Climate risk catches up with AI sites
XDI’s analysis pushes climate risk into AI site selection decisions.
-
Google makes power the EMEA brief
Google’s EMEA energy brief now centres on AI power strategy.
-
Ljubljana puts Blackwell on the roof
Ljubljana’s FRIDA system puts Blackwell GPUs into rooftop compute infrastructure.
-
MIRhosting outage turns legal risk physical
MIRhosting’s Dutch outage exposes contractual risk inside complex colocation chains.
-
XTX digs deeper into Kajaani
XTX is adding another Kajaani shell for machine-learning compute capacity.
-
HIVE buys the keys to Boden
HIVE is turning a Swedish tenancy into AI infrastructure ownership.
-
Pori turns powered land into a sale
Polarnode has sold powered Finnish land with permits already secured.
-
CloudGrid takes AI to the power site
CloudGrid is placing modular AI compute beside renewable power sites.
-
Brussels cuts AI gigafactories to size
Brussels is scaling AI gigafactories around power, finance, and buildability.










