Sustainability
-
firstcolo starts FRA7 data centre build
firstcolo has broken ground on FRA7, a high density Rosbach data centre designed for AI, HPC, renewable power, and heat reuse.
-
Slough data centre appeal allowed
Ministers have allowed the Manor Farm data centre appeal in Slough, adding another planning decision for large UK digital infrastructure schemes.
-
Amazon discloses data centre water use
Amazon says its global data centres withdrew 2.5bn gallons of water in 2025, sharpening transparency questions around AI infrastructure.
-
Lombardy tightens data centre rules
Lombardy has approved a data centre law aimed at steering rapid capacity growth towards brownfield land and clearer authorisation routes.
-
Vertiv completes ThermoKey acquisition
Vertiv has closed its ThermoKey deal, strengthening European heat-rejection capacity as AI workloads raise pressure on cooling supply chains.
-
AmpTank plans Utajärvi AI data centre
AmpTank is moving from Nordic battery storage into hyperscale compute with a Finnish data centre tied to grid flexibility and nearby renewables.
-
Study raises data centre heat questions
A new study links AI data centres to local land-temperature increases, adding heat rejection to the planning and sustainability debate.
-
Panasonic targets data centre batteries
Panasonic plans battery cell production for data centre applications in Kansas, signalling deeper industrial capacity behind AI-era critical power systems.
-
Global Switch signs second Drax PPA
Global Switch has signed a second long-term Drax power deal, adding solar-backed supply as UK data centre operators tighten energy procurement.
-
EU targets faster data centre deployment
The European Commission’s Cloud and AI Development Act places data centre deployment inside Europe’s sovereignty, permitting, and energy-capacity agenda.










