Markets and policy
-
Philippsburg rewires its power past
A former German energy site could become a hyperscale campus built around grid access, substations, and waste heat.
-
Northumberland’s power-first campus test
Wansbeck Regeneration has filed plans for a 356,500 sq m Northumberland data centre campus with substations, power plant, and emergency generation.
-
Almere fire reaches the contract layer
Utrecht University’s damages claim after the NorthC Almere fire pushes data centre resilience into contracts, recovery plans, and customer exposure.
-
Sweden brings cloud into command
Sweden’s Armed Forces are working with evroc on SINCC, a sovereign combat cloud designed for classified command-and-control workloads.
-
Amazon buys into Baltic power
Amazon has signed a 600MW PPA for Skyborn’s Gennaker offshore wind farm, adding long-term power procurement to Germany’s data centre growth story.
-
Climate risk catches up with AI sites
XDI’s analysis pushes climate risk into AI site selection decisions.
-
Google makes power the EMEA brief
Google’s EMEA energy brief now centres on AI power strategy.
-
Ljubljana puts Blackwell on the roof
Ljubljana’s FRIDA system puts Blackwell GPUs into rooftop compute infrastructure.
-
MIRhosting outage turns legal risk physical
MIRhosting’s Dutch outage exposes contractual risk inside complex colocation chains.
-
XTX digs deeper into Kajaani
XTX is adding another Kajaani shell for machine-learning compute capacity.










