DataCentral Editorial
-
Era4 plans landfill-powered Canterbury data centre
Era4 has filed plans for a small AI data centre at a Canterbury landfill site, using private-wire landfill gas power and closed-loop liquid cooling.
-
Google starts Horndal data centre build
Google has broken ground on its first owned and operated data centre in Sweden, with air cooling and heat-recovery readiness in the design.
-
Retrofit narrows AI cooling cost gap
STL Partners research suggests liquid cooling retrofits can cut headline AI upgrade capex sharply against new greenfield capacity.
-
Schneider targets AI cooling with XCA chillers
Schneider Electric has launched a new Uniflair XCA chiller line for high-density, liquid-cooled AI data centres.
-
Generac lands hyperscale backup power deal
Generac has signed a global supply agreement with an unnamed hyperscale data centre operator for backup generation infrastructure.
-
ABB joins Nvidia AI factory blueprint
ABB will add power infrastructure models to Nvidia’s Omniverse DSX platform, supporting source-to-rack simulation before construction.
-
EDF picks data centre bidders for power sites
EDF has selected SoftBank and Eclairion for large AI data centre projects at former power-station sites in France.
-
Pure DC tests biomethane route for Dublin power
Pure DC has moved German biomethane into Ireland’s gas network for a Dublin data centre, testing a certified route for lower-carbon gas supply.




